Double Shower Cubicle

Delivery term:The date of payment from buyers deliver within days
  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Zhejiang

  • Validity to:

    Long-term effective

  • Last update:

    2023-11-19 20:09

  • Browse the number:

    252

Send an inquiries
Company Profile
Pinghu Aisner Sanitary Ware Co., Ltd
Contactaixin:

aisina(Mr.)  

Email:

telephone:

phone:

Arrea:

Zhejiang

Address:

No.288 Of Second Floor Office, Sanitary Ware Industrial City In Xindai Town, Pinghu City, Zhejiang, China

Website:

http://www.asn-sanitary.com/ http://aisina.norwichbudgetprint.com/

Product details

    Installation Guide for Double Shower Cubicle

    The double shower cubicle is an excellent product that adds elegance and functionality to your bathroom. It is a spacious unit designed to accommodate two individuals showering at the same time. The cubicle is made of high-quality materials that ensure durability, longevity, and resistance to water damage. Installing this cubicle requires basic DIY skills, and this guide provides an elaborate installation process.

    Step 1: Prepare the Area of Installation
The first step in installing the double shower cabin  is preparing the area where you want to place it. Ensure that the floor is even, clean, and level. If it is not level, use leveling compounds to even it out. In case the cubicle is to be installed on a wooden or solid floor, use an appropriate base to support it.

    Step 2: Assemble the Shower Cubicle
Assembling the shower cabin  is the next step towards installing it. Follow the instructions provided in the manual to join all the components. Start by assembling the base tray, walls, glass doors, and frames. Assemble the side panels and then the front panel. Ensure that all screws are tightly fixed and there are no loose parts. Verify that the walls are perpendicular to the base tray and securely attached together.

     Step 3: Install the Waste Pipe and Shower Tray
The next step involves installing the waste pipe and shower tray. Ensure that the waste outlet aligns with the drain hole and place the shower tray on the ground. Test the tray to ensure that it is level and flat before fitting the waste pipe. Attach the waste pipe to the waste outlet and secure it using a nut. Ensure that the waste pipe is fixed in a way that it flows water towards the drain hole.

 

Product Name

Double Shower Cubicle

Size

1400*1400*2100mm

Shape

SECTOR

Glass thickness

Front glass is 5mm /6mm clear glass , back glass is 4mm /5mm .

Model Number

AX-723

Profile style

Chrome , white painting /matt sliver /black painting

Weight/CBM

140kgs /0.9/cbm

Rollers

Single up,Single Down/Double up,Double Down Double chrome

plated wheels up&Down.

 

Handles

White plastic, chrome colour plastic, stainless steel znic alloy,etc.

Shower tray

Low tray(10-15cm), Black Acrylic tray /white acrylic tray

Optional function

Computer panel , steam , lamp,radio,fan,double abs seat,bluetooth ,massage jets , glass shelf , complete mixer, ABS seat, feet massage ,soap dispenser and etc .

Packing

Export standard double corrugated carton with airbubble or

plastic film inside.

Foam protector is optional.

 

Payment

T/T, L/C, other

Certificate

CE , Tempered glass with EN12150 certification, ISO9001 ,UPC,CUPC and etc .

 

Our steam shower room has many accessory to be choose as follows :


 

    Step 4: Fix the Cubicle
After completing the assembly process and ensuring that the waste pipe and the tray are in place, carefully lift the cubicle and place it in position. Identify the fixing points and mark them on the floor. Lift the shower tray and drill holes where the marks were made. Fix the cubicle to the floor using the correct screws and anchors for the material of the floor. Tighten the screws until the cubicle is firmly fixed, but do not over-tighten them as they may damage the cubicle.

    Step 5: Connect the Shower Heads and Controls
The next step is connecting the showerheads and controls. Install all the showerheads according to the manufacturer's instructions. Ensure that the showerheads are level and at the appropriate height. Connect the showerheads to the water supply using compatible flexible hoses and fit the control panel on the wall.

    Step 6: Seal the Joints
The final step is sealing the joints. Apply silicone sealant around the shower edges to prevent water leakage between the seams. Ensure that the sealant is applied evenly and smoothly. Leave the sealant to dry for a minimum of 24 hours before using the shower.

Conclusion
    Installing a double shower  shower room  is a straightforward process that requires basic DIY skills. The installation process involves preparing the area of installation, assembling the shower cubicle, installing the waste pipe and shower tray, fixing the cubicle, connecting shower heads, and controls and sealing the joints. Follow these steps keenly, and you will have your double shower cubicle installed in no time.

 

 

http://www.asn-sanitary.com/